|
|
Modeling of and Algorithm for Resource Constrained Project Scheduling Problem with Resource Allocation Dependent Processing Time |
School of Mechanical and Energy Engineering, Tongji University, Shanghai 201804, China |
|
|
Abstract Abstract: In classical resourceconstrained project scheduling problems, the job processing times are assumed to be constant parameters. However, in many practical cases, the processing times depend on the resource allocated to the job. In this paper, the resourceconstrained project scheduling problem was introduced with resource allocation dependent processing time to minimize the duration of the project. A model was established and a genetic algorithm was proposed to solve the problem. To improve the ability of the algorithm, a 1opt based local search scheme and a 2opt based local search scheme were introduced.The related properties between different job combinations and the objective of the problem were summarized and proved. Based on these properties, the approach for selecting effective job combinations was established, which greatly improved the efficiency of the algorithm in local search. Comparative computational results reveal that the algorithm proposed in this paper can solve the problem effectively.
|
Published: 31 January 2017
|
|
|
|
|
[1] |
LU Zhiqiang,YANG Chao. Modeling of Resource Constrained MultiProject Scheduling Problem Based on Project Splitting[J]. J. Shanghai Jiaotong Univ.(Sci.) , 2017, 51(2): 193-. |
[2] |
QI Faqun,ZHOU Binghai. Preventive Maintenance Policy of Cluster Tools Based on Markov Process[J]. J. Shanghai Jiaotong Univ.(Sci.) , 2014, 48(10): 1461-1467. |
[3] |
CAO Weihua1,2,CAI Yiqing2,YUAN Yan1,2,WU Min1,2. Exergy Efficiency Calculation and Parameter Optimization of the Sintering Waste Heat Recovery System[J]. J. Shanghai Jiaotong Univ.(Sci.) , 2014, 48(07): 1046-1052. |
[4] |
REN Shu-1, JI Xiao-Jun-1, DONG Hao-Ran-1, CAI Ping-1, HAN Tao-1, CHEN Le-Sheng-2, ZHOU Xian-Mei-2. Optimal Matching Algorithm for Heat Measuring Instrument with Platinum Resistance[J]. J. Shanghai Jiaotong Univ.(Sci.) , 2013, 47(04): 663-666. |
[5] |
ZHOU Su-1a, 1b , JI Guang-Ji-1a, LIU Ji-Chen-1a, HU Zhe-2. Research on the Oxygen Excess Ratio Fluctuation with Current Regulation for a PEM Fuel Cell Engine[J]. J. Shanghai Jiaotong Univ.(Sci.) , 2012, 46(11): 1712-1717. |
[6] |
HAN Yi-1a, 1b , 2 , CAI Jian-Hu-1a, 1b , LI Yan-Lai-3, YE Xu-Hong-1a, LIN Hua-Zhen-1a, WANG Wei-1a. Shuffled Frog Leaping Algorithm for Multisupplier Selection
Problem with Multiple Products and Discounts[J]. J. Shanghai Jiaotong Univ.(Sci.) , 2012, 46(04): 567-572. |
|
|
|
|