J. Shanghai Jiaotong Univ.(Sci.)   2011, Vol. 45 Issue (05): 672-676    DOI:
Communication and Transportation Current Issue | Archive | Adv Search |
Study on Ground Settlement Caused by Shield Tunneling Long Distance Across Multitracks
 XIAO  Li, ZHANG  Qing-He
(Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China)

Tel: 021-62933373 Fax: 021-62933373 E-mail: xuebao3373@sjtu.edu.cn