J. Shanghai Jiaotong Univ.(Sci.)   2012, Vol. 46 Issue (04): 651-656    DOI:
Automation Technique, Computer Technology Current Issue | Archive | Adv Search |
Two-Dimensional Irregular Spatial Scheduling Method for Hull Block Construction in Shipbuilding
 ZHANG  Zhi-Ying-1, YANG  Ke-Kai-1, YU  Jin-Wei-2
(1.School of Mechanical Engineering, Tongji University, Shanghai 200092, China; 2.Jiangsu Rongsheng Shipbuilding Co. Ltd., Rugao 226532, Jiangsu, China)

Tel: 021-62933373 Fax: 021-62933373 E-mail: xuebao3373@sjtu.edu.cn