Journal of Shanghai Jiao Tong University ›› 2023, Vol. 57 ›› Issue (6): 690-699.doi: 10.16183/j.cnki.jsjtu.2021.032
Special Issue: 《上海交通大学学报》2023年“船舶海洋与建筑工程”专题
• Naval Architecture, Ocean and Civil Engineering • Previous Articles Next Articles
DAI Zhiheng1, ZHANG Mengxi1(
), WEI Hui2, GU Jie1, ZHANG Xiaoqing1
Received:2021-01-27
Revised:2021-04-19
Accepted:2021-05-04
Online:2023-06-28
Published:2023-07-05
Contact:
ZHANG Mengxi
E-mail:mxzhang@i.shu.edu.cn.
CLC Number:
DAI Zhiheng, ZHANG Mengxi, WEI Hui, GU Jie, ZHANG Xiaoqing. Stability Analysis of Shield Cutter Replacement Ground Reinforced with Steel Pipe Pile-Grouting[J]. Journal of Shanghai Jiao Tong University, 2023, 57(6): 690-699.
Add to citation manager EndNote|Ris|BibTeX
URL: https://xuebao.sjtu.edu.cn/EN/10.16183/j.cnki.jsjtu.2021.032
Tab.1
Mechanical properties of strata
| 地层类型 | 土层名称 | 厚度/m | 弹性模量/MPa | 内摩擦角/(°) | 黏聚力/kPa | 泊松比 | 重度/(kN·m-3) |
|---|---|---|---|---|---|---|---|
| 全风化地层 | 素填土 | 9.0 | 2.5 | 7.0 | 12.0 | 0.20 | 19.0 |
| 粉质黏土 | 8.0 | 36.2 | 20.0 | 10.6 | 0.25 | 19.0 | |
| 全风化砂岩 | 15.5 | 60.0 | 23.1 | 9.6 | 0.32 | 20.0 | |
| 强风化砂岩 | 7.5 | 70.0 | 32.5 | 2.0 | 0.28 | 21.0 | |
| 中风化砂岩 | 20.0 | 80.0 | 35.0 | 3.0 | 0.27 | 23.0 | |
| 上软下硬地层 | 素填土 | 2.0 | 2.5 | 7.0 | 12.0 | 0.20 | 19.0 |
| 粉质黏土 | 24.0 | 36.2 | 20.0 | 10.6 | 0.25 | 19.0 | |
| 全风化二长花岗岩 | 26.0 | 108.8 | 21.3 | 18.2 | 0.32 | 21.0 |
| [1] | 周志强, 钟显奇, 宋金良, 等. 广州地区盾构施工风险及控制技术要点[J]. 隧道建设, 2010, 30(5): 608-611. |
| ZHOU Zhiqiang, ZHONG Xianqi, SONG Jinliang, et al. Risk analysis and risk control technology for shield tunneling in Guangzhou region[J]. Tunnel Construction, 2010, 30(5): 608-611. | |
| [2] | 陈健, 刘红军, 闵凡路, 等. 盾构隧道刀具更换技术综述[J]. 中国公路学报, 2018, 31(10): 36-46. |
| CHEN Jian, LIU Hongjun, MIN Fanlu, et al. Technical review of cutter replacement in shield tunneling[J]. China Journal of Highway and Transport, 2018, 31(10): 36-46. | |
| [3] |
朱伟, 钱勇进, 王璐, 等. 土压平衡盾构不满舱施工遇到的问题及对策[J]. 中国公路学报, 2020, 33(12): 224-234.
doi: 10.19721/j.cnki.1001-7372.2020.12.018 |
|
ZHU Wei, QIAN Yongjin, WANG Lu, et al. Problems and measures of earth pressure balance shield during construction with the unfilled chamber[J]. China Journal of Highway and Transport, 2020, 33(12): 224-234.
doi: 10.19721/j.cnki.1001-7372.2020.12.018 |
|
| [4] | 宋洋, 李昂, 王韦颐, 等. 泥岩圆砾复合地层泥水平衡盾构泥浆配比优化研究与应用[J]. 岩土力学, 2020, 41(12): 4054-4062. |
| SONG Yang, LI Ang, WANG Weiyi, et al. Research and application of mud proportioning optimization of slurry balance shield in mudstone and gravel composite stratum[J]. Rock and Soil Mechanics, 2020, 41(12): 4054-4062. | |
| [5] | 王林, 韩凯航, 郭彩霞, 等. 考虑局部失稳的盾构隧道开挖面挤出破坏数值模拟与理论分析[J]. 土木工程学报, 2020, 53 (Sup.1): 50-56. |
| WANG Lin, HAN Kaihang, CUO Caixia, et al. Numerical simulation and theoretical analysis of passive failure mechanism of shield tunnel face considering partial instability[J]. China Civil Engineering Journal, 2020, 53 (Sup.1): 50-56. | |
| [6] | 宋洋, 王韦颐, 杜春生. 砂-砾复合地层盾构隧道开挖面稳定模型试验与极限支护压力研究[J]. 岩土工程学报, 2020, 42(12): 2206-2214. |
| SONG Yang, WANG Weiyi, DU Chunsheng. Model tests on stability and ultimate support pressure of shield tunnel in sand-gravel composite stratum[J]. Chinese Journal of Geotechnical Engineering, 2020, 42(12): 2206-2214. | |
| [7] | 牛豪爽, 翁效林, 余航飞, 等. 渗流作用下粉砂地层中盾构隧道开挖面失稳模式离心试验研究[J]. 土木工程学报, 2020, 53(Sup.1): 99-104. |
| NIU Haoshuang, WENG Xiaolin, YU Hangfei, et al. Centrifugal test study on instability mode of shield tunnel excavation face in silty sand stratum under seepage[J]. China Civil Engineering Journal, 2020, 53 (Sup.1): 99-104. | |
| [8] | 杨峰, 何诗华, 吴遥杰, 等. 非均质黏土地层隧道开挖面稳定运动单元上限有限元分析[J]. 岩土力学, 2020, 41(4): 1412-1419. |
| YANG Feng, HE Shihua, WU Yaojie, et al. Tunnel face stability analysis by the upper-bound finite element method with rigid translatory moving element in heterogeneous clay[J]. Rock and Soil Mechanics, 2020, 41(4): 1412-1419. | |
| [9] | 米博, 项彦勇. 砂土地层浅埋盾构隧道开挖渗流稳定性的模型试验和计算研究[J]. 岩土力学, 2020, 41(3): 837-848. |
| MI Bo, XIANG Yanyong. Model experiment and calculation analysis of excavation-seepage stability for shallow shield tunneling in sandy ground[J]. Rock and Soil Mechanics, 2020, 41(3): 837-848. | |
| [10] |
代仲海, 胡再强. 穿越紧邻隧道时盾构开挖面稳定性分析[J]. 中国公路学报, 2020, 33(1): 145-152.
doi: 10.19721/j.cnki.1001-7372.2020.01.015 |
|
DAI Zhonghai, HU Zaiqiang. Stability analysis of excavation face during shield passing through adjacent tunnel[J]. China Journal of Highway and Transport, 2020, 33(1): 145-152.
doi: 10.19721/j.cnki.1001-7372.2020.01.015 |
|
| [11] | 程红战, 陈健, 胡之锋, 等. 考虑砂土抗剪强度空间变异性的盾构开挖面稳定性分析[J]. 岩土力学, 2018, 39(8): 3047-3054. |
| CHENG Hongzhan, CHEN Jian, HU Zhifeng, et al. Face stability analysis for a shield tunnel considering spatial variability of shear strength in sand[J]. Rock and Soil Mechanics, 2018, 39(8): 3047-3054. | |
| [12] |
ESHRAGHI A, ZARA S. Face stability evaluation of a TBM-driven tunnel in heterogeneous soil using a probabilistic approach[J]. International Journal of Geomechanics, 2015, 15(6): 04014095.
doi: 10.1061/(ASCE)GM.1943-5622.0000452 URL |
| [13] | 朱明听, 张庆松, 李术才, 等. 劈裂注浆加固土体的数值模拟和试验研究[J]. 中南大学学报(自然科学版), 2018, 49(5): 1213-1220. |
| ZHU Mingting, ZHANG Qingsong, LI Shucai, et al. Numerical simulation and experimental study on soil split grouting reinforcement mechanism[J]. Journal of Central South University(Science and Technology), 2018, 49(5): 1213-1220. | |
| [14] | 陈锦剑, 王建华, 朱峰. 软土地区单桩沉降的简化计算方法[J]. 上海交通大学学报, 2006, 40(12): 2126-2129. |
| CHEN Jinjian, WANG Jianhua, ZHU Feng. A simplified calculation for the settlement of single piles in soft foundation[J]. Journal of Shanghai Jiao Tong University, 2006, 40(12): 2126-2129. |
| [1] | HOU Yongmao. Face Stability Analysis of Tunnels with Consideration of the Influence of Excess Pore Pressures [J]. Journal of Shanghai Jiaotong University, 2015, 49(07): 973-976. |
| [2] | Hao LI, Jin-tang WANG, Bao-jiang SUN, Cheng-zhang CAO, Chun-li LI, Ke-wang XU. Simulation Analysis of Cementing Displacement in Offshore Extended Reach Well [J]. Ocean Engineering Equipment and Technology, 2014, 1(1): 14-20. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||