海底管道机械测径与水压试验标准对比分析

曹聚杭1,张婕1*,李健1,孟志伟1,黄佳瀚1,高磊1,成二辉1,李晶1,于远方1,杨转1,唐豫2   

  1. 1. 中海油深圳海洋工程技术服务有限公司,广东 深圳 518054;2. 中海石油(中国)有限公司海南分公司,海南 海口 570100
  • 出版日期:2025-12-29 发布日期:2025-12-29
  • 通讯作者: 张婕 E-mail:caojh8@cooec.com.cn
  • 作者简介:曹聚杭(1991—),男,硕士研究生,中级工程师,主要从事深水油气设施调试、安装技术方向的研究。

Standard Comparison between Mechanical Gauging and Pressure Testing for Subsea Pipelines

CAO Juhang1, ZHANG Jie1*, LI Jian1, MENG Zhiwei1, HUANG Jiahan1,GAO Lei1, CHENG Erhui1, LI Jing1, YU Yuanfang1, YANG Zhuan1, TANG Yu2   

  1. 1. CNOOC Offshore Engineering Solution Co., Ltd., Shenzhen 518054, Guangdong, China;2. CNOOC China Limited, Hainan Branch, Haikou 570100, Hainan, China
  • Online:2025-12-29 Published:2025-12-29
  • Contact: ZHANG Jie E-mail:caojh8@cooec.com.cn

摘要: 基于海底管道机械测径和水压试验在海管工程建设中的重要意义,重点梳理了ASME、 API与DNV标准对海管机械测径和系统水压试验的要求。通过阐释海管机械测径的原理,分析了不同标准下测径板直径计算方法。基于海管压力试验原理,明确了测试压力和稳压时间是海管试压中的两个关键参数。压力试验值的大小取决于压力试验中需要检查出的缺陷大小。稳压时间的长短影响因素较多,主要包括泄漏点大小、海管容积、海管直径等。虽ASME、 API与DNV在海管试压方面的总体原则基本一致,但在测试压力和稳压时间的选取上存在不同,工程实践中需分析其适用性。

关键词: 海底管道, 管道测径, 管道压力试验, 测试压力, 稳压时间

Abstract: Given the significant importance of mechanical gauging and pressure testing for submarine pipelines in offshore pipeline construction, this study focuses on reviewing the requirements for mechanical gauging and system pressure testing as outlined in the ASME, API, and DNV standards. By explaining the principles of submarine pipeline mechanical gauging, the calculation methods for gauge-plate diameters under different standards are analyzed. Based on the principles of pipeline pressure testing, it is clarified that test pressure and holding time are the two critical parameters in pipeline pressure testing. The magnitude of the test pressure depends on the size of the defects that need to be detected during the test. The duration of holding time is influenced by multiple factors, including the size of leaks, pipeline volume, and pipeline diameter. Although ASME, API, and DNV share similar general principles for submarine pipeline pressure testing, differences exist in the selection of test pressure and holding time, which necessitates an analysis of their applicability in engineering practice.

Key words: subsea pipeline, pipeline gauging, pipeline pressure test, test pressure, holding time