胜利埕岛油田自升式平台反复插桩入泥起算深度分析

  • 张达1 ,
  • 黄承义1 ,
  • 邢宝康1 ,
  • 林增勇2 ,
  • 亓孝辉3 ,
  • 齐珺1
展开
  • 1.青岛环海海洋工程勘察研究院有限责任公司,山东 青岛 266000;2.中石化胜利石油工程有限公司,山东 东营 257000;3.中国冶金地质总局青岛地质勘查院,山东 青岛 266000
张达(1992— ),男,硕士,工程师,主要从事海洋岩土方面的研究。

网络出版日期: 2025-06-05

基金资助

山东博士后科学基金资助(SDBX2023071)

Analysis of Initial Mud Depth of Pile Repeatedly Inserted into Mud in Shengli Chengdao Oilfield Jack-Up Platform

  • ZHANG Da1 ,
  • HUANG Chengyi1 ,
  • XING Baokang1 ,
  • LIN Zengyong2 ,
  • QI Xiaohui3 ,
  • QI Jun1
Expand
  • 1.Qingdao Huanhai Marine Engineer Prospecting Institute Co., Ltd., Qingdao 266000, Shandong, China; 2.Sinopec Shengli Petroleum Engineering Co., Ltd., Dongying 257000, Shandong, China; 3.Qingdao Geological Exploration Institute of Metallurgical Geology of China, Qingdao 266000, Shandong, China

Online published: 2025-06-05

摘要

由于自升式平台二次插桩或多次插桩在同一区域形成较多形状各异的散点状桩坑,反复插拔桩区域地形起伏较大。当自升式平台二次就位时,自升式平台入泥起算深度在反复插拔桩区域计算存在较多问题,如海底起伏、桩靴差异、土体不均匀等导致常规计算方法得出的计算结果不准确。通过总结此类问题,对比现有计算方法,结合物探地形资料、拖航船实时水深,提出一种适合反复插拔桩区域的入泥起算深度确定方法,提高在反复插拔桩区域自升式平台入泥深度计算的准确性。

本文引用格式

张达1 , 黄承义1 , 邢宝康1 , 林增勇2 , 亓孝辉3 , 齐珺1 . 胜利埕岛油田自升式平台反复插桩入泥起算深度分析[J]. 海洋工程装备与技术, 2025 , 12(1) : 37 -44 . DOI: 10.12087/oeet.2095-7297.2025.01.05

Abstract

Due to the many scattered pile pits of different shapes formed in the same area by double or multiple pile insertion of jack-up platform, the topographic relief changes greatly in the area of repeated insertion and removal of the pile. When the jack-up platform takes its place once again, there are many misunderstandings in the calculation of the initial mud depth of the jack-up platform, resulting from the seabed relief, pile shoe difference, and nonuniformity in the soil body. We summarize several common misunderstandings, compare the existing calculation methods, combine the geophysical topographic data, the real-time water depth of the towing ship and the change of pressurized current in the control room of the jack-up platform, and propose a method for determining the initial mud depth suitable for the area of repeated pile insertion and removal. This method improves the accuracy of calculation of mud depth for jack-up platform insertion in the area of repeated pile insertion and removal.