|
|
Optimization Control Software for Raw Slurry Production Process |
BAI Rui1,2,REN Qunying1,GUO Wanli1 |
(1. School of Electrical Engineering, Liaoning University of Technology, Jinzhou 121001, Liaoning, China; 2. State Key Laboratory of Synthetical Automation for Process Industries, Northeastern University, Shenyang 110004, China) |
|
|
Abstract The optimization control method for the raw slurry production process was studied. According to the optimization control method, the optimization control software was designed and developed which is composed of the optimization software, process control software and monitoring interface. The structure, funciton, program flowchart and interface of the optimization control software were described in detail.
|
Received: 03 June 2013
Published: 28 July 2014
|
|
|
|
|
[1] |
XIE Zhi-Qiang-1, 2 , LIU Chang-Hai-1, YANG Jing-2. Batch Integrated Scheduling Algorithm Considering Posterior Operations and with Constraint of 2 Operations Batches Processing[J]. J. Shanghai Jiaotong Univ.(Sci.) , 2012, 46(11): 1746-1752. |
[2] |
HU Da-Yong, YAO Zhen-Qiang. Optimization Strategy for Bulk Ship Unloader Scheduling with Rail Routing Constraints[J]. J. Shanghai Jiaotong Univ.(Sci.) , 2012, 46(09): 1431-1435. |
[3] |
JIANG Shu-yu,ZHOU Bing-hai. A WorkinProcess Estimation Method Based on Bottleneck Machines’ Process Time Variability[J]. J. Shanghai Jiaotong Univ.(Sci.) , 2008, 42(12): 1953-1957. |
|
|
|
|