薛恒, 黄盛海, 刘志强, 唐佳荷
XUE Heng, HUANG Sheng-hai, LIU Zhi-qiang, TANG Jia-he
摘要: Taking the E20 deck of EP18-1 project for example, explaining how to use the PDMS software to give a pipe support integrated construction plan. Building several models and simulating the process of fabrication in the shop, transportation on SPMT and lifting on the site. Pipe supports without any clash during these process will be installed on the deck in advance. This method will contribute to increasing the efficiency of construction.
中图分类号: