Firstly, the purpose of study on interface principle for topside of FPSO is introduced; Secondly, the typical main process scheme, general arrangement, structure scheme are illustrated; Thirdly, the interface between FPSO topside and Hull/Subsea are analyzed and demonstrated, including the interface about process, general area, structure, EIT. Finally, it is prospected how to proceed the interface principal study in the future.