Ocean Engineering Equipment and Technology
Previous Articles Next Articles
GAO Rui-li, LU Jing, GAO Jin-yan, ZHOU Yu-chen, GUO Mei-shan, MA Si-yao
Online:
Published:
Abstract: There are three tenors during the construction process of offshore oil steel structure which are high risk, high investment and high yield. For effectively and scientifically guiding the construction, the architectural technology of jacket large Marine structures construction, should fully consider about the venue, crane, transport, offshore installation of shipment and others important links. Offshore oil engineering construction has been developing rapidly in the last 30 years of reform and openness. The method of construction of offshore jacket has also been updated according to the progress of several of resources. This thesis describes different methods of construction of offshore jacket during different stages of the resources.
CLC Number:
TU391
GAO Rui-li, LU Jing, GAO Jin-yan, ZHOU Yu-chen, GUO Mei-shan, MA Si-yao. Method Analysis of Offshore Oil Steel Structure Jacket Construction[J]. Ocean Engineering Equipment and Technology.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.qk.sjtu.edu.cn/oeet/EN/
https://www.qk.sjtu.edu.cn/oeet/EN/Y2018/V5/I增刊/264