Ocean Engineering Equipment and Technology ›› 2021, Vol. 8 ›› Issue (2): 15-20.doi: 10.12087/oeet.2095-7297.2021.02.04
Previous Articles Next Articles
WANG Jianjun
Online:
Published:
WANGJianjun. Analysis of Installation Process of Floating Offloading Hose of Deepwater Semi-Submersible Production Platforms[J]. Ocean Engineering Equipment and Technology, 2021, 8(2): 15-20.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.qk.sjtu.edu.cn/oeet/EN/10.12087/oeet.2095-7297.2021.02.04
https://www.qk.sjtu.edu.cn/oeet/EN/Y2021/V8/I2/15