The air-conditioning system of deepwater semi-submersible drilling rig directly affects the health of employees and the operation safety of electrical equipment on the platform. For the air-conditioning system equipment selection of a semi-submersible drilling rig in the South China Sea, comparison of the same type of semi-submersible drilling rigs is carried out, and the environmental conditions of the South China Sea are investigated and analyzed. Considering the spatial arrangement of deepwater semi-submersible drilling rig, the environmental conditions and the requirements on vibration, noise and comfortableness in NORSOK standards, the air-conditioning system equipment selection of this platform is accomplished.
HE Yang
. Equipment Selection for the Air-Conditioning System of Deepwater Semi-Submersible Drilling Rig[J]. Ocean Engineering Equipment and Technology, 2018
, 5(3)
: 202
-207
.
DOI: 10.12087/oeet.2095-7297.2018.03.10
1 李松.海洋环境下船用空调现状及发展探讨[J].制冷与空调,2005,5(2): 16.
Li Song. Investigation of air conditioning in marine from present situation and development [J]. Refrigeration and Air-Conditioning, 2005,5(2): 16.
2 黄金衔,骆安.船舶中央空调系统的构造分析及选择原则[J].广东造船,2010(1): 44.
Huang Jin-xian, Luo An. Structure analysis and selection of marine central air conditioning system [J]. Guangdong Shipbuilding, 2010(1): 44.
3 NORSOK. NORSOK S-002. Working environment (Rev.4)[S]. 2004.