Semi-Floating Construction Operation Method of Offshore Wind Power Jack-Up Installation Vessel
Online published: 2025-06-05
ZHANG Jianxiang1 , LI Shifei1 , TANG Yong2 , ZHANG Xiaodong2 , ZHANG Mingming2 . Semi-Floating Construction Operation Method of Offshore Wind Power Jack-Up Installation Vessel[J]. Ocean Engineering Equipment and Technology, 2025 , 12(1) : 53 -60 . DOI: 10.12087/oeet.2095-7297.2025.01.07
/
| 〈 |
|
〉 |