1 张登俊, 赵新义, 桑运水, 等. 浅海油田大型导管架施工技术探讨[J]. 中国海洋平台, 2002, 17(3): 30.
Zhang Deng-jun, Zhao Xin-yi, Sang Yun-shui, et al. The installation of large offshore jacket in shallow sea oil field [J]. China Offshore Platform, 2002, 17(3): 30.
2 魏佳广, 严亚林. 涠洲11-2 WHPB导管架拖拉装船设计及工程应用[J]. 石油工程建设, 2016, 42(6): 27.
Wei Jia-guang, Yan Ya-lin. Design and engineering application of WZ11-2 WHPB jacket load-out [J]. Petroleum Engineering Construction, 2016, 42(6): 27.
3 Jo C H, Kim K S, Lee S H. Parametric study on offshore jacket launching [J]. Ocean Engineering, 2002, 23(29): 1959.
4 李新超. 超大型导管架滑移装船方法研究[J]. 中国水运, 2013, 13(3): 33.
Li Xin-chao. Skidded loadout method research of large jacket [J]. China Water Transport, 2013, 13(3): 33.
5 郭庆, 高静坤. 大型导管架的装船分析[J]. 中国造船, 2008, 49(a02): 316.
Guo Qing, Gao Jing-kun. Loadout analysis on deep water jacket [J]. Shipbuilding of China, 2008, 49(a02): 316.
6 刘钊, 黄怀州, 荆潇. 深水导管架滑移装船强度分析[J]. 石油和化工设备, 2016, 19(2): 30.
Liu Zhao, Huang Huai-zhou, Jing Xiao. Structural analysis on deeper water jacket skidded loadout analysis [J]. Petro & Chemical Equipment, 2016, 19(2): 30.
7 American Petroleum Institute. API RP 2A-WSD. Recommended practice for planning, designing and constructing fixed offshore platforms: working stress design [S]. 2010.
8 American Institute of Steel Construction (AISC). Manual of steel construction: allowable stress design [S]. 2010. |