Ocean Engineering Equipment and Technology ›› 2023, Vol. 10 ›› Issue (3): 113-117.doi: 10.12087/oeet.2095-7297.2023.03.16
Previous Articles Next Articles
Marine lifting optimization of separated lifting topsides of eight legs central production platform #br#
LAN Guoyang, YUAN Yujie, HU Xingtao, SUN
Huafeng