Ocean Engineering Equipment and Technology ›› 2014, Vol. 1 ›› Issue (1): 91-94.
• Orginal Article • Previous Articles
Tai-an HUANG, Zheng-rong SONG, Long YU, Xiao-gang ZHANG, Xiao-hua JIANG, Jia WANG, Geng XU, Bao-rui YIN
Received:
Online:
Published:
Abstract:
VANTAGE Project Resource Management (VPRM) material coding rules are designed reasonably and strictly so that "one material one code" can be ensured. The uniqueness of VPRM code can be applied to the tracking management of bulk materials commonly used in offshore oil engineering projects. At the same time, the VPRM code, which is used throughout the whole construction process including material design, procurement, warehousing, and storage, can be regarded as the main line of material management information system. Based on the research of VPRM coding, we introduce the VPRM material code examples and their application in piping material management of an offshore oil engineering project. This will provide beneficial reference for the management of other materials, and offer new ideas for the management of materials in offshore oil engineering.
Key words: offshore oil engineering, material coding, life cycle management, VPRM, discrete manufacturing
CLC Number:
P75
Tai-an HUANG, Zheng-rong SONG, Long YU, Xiao-gang ZHANG, Xiao-hua JIANG, Jia WANG, Geng XU, Bao-rui YIN. Deepening Application of VPRM Material Coding in Offshore Oil Engineering Construction[J]. Ocean Engineering Equipment and Technology, 2014, 1(1): 91-94.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.qk.sjtu.edu.cn/oeet/EN/
https://www.qk.sjtu.edu.cn/oeet/EN/Y2014/V1/I1/91
Fig.1
Principle of VPRM commodity code
Fig.2
Principle of VPRM part number
Fig.3
Material sheet in the form of ISO drawing
Fig.4
Batch statistical results of pipeline materials
Fig.5
Basic data table of VPRM coding after standardization
Fig.6
Software interface for automatic generation of material list