Outline of General Arrangement for Semi-Submersible Crane and Pipe-Laying Vessel

ZHONG Wen-jun, PENG Xiao-jia, HE Ning   

  1. Offshore Oil Engineering Co., Ltd., Tianjin 300451, China
  • Received:2017-07-31 Online:2017-12-25 Published:2018-01-02
  • Supported by:
     

Abstract: Semi-submersible crane vessel (SSCV) is one of the most important equipment to develop deepwater oil and gas field. With a lot of equipment on board, the general arrangement plan needs to consider the ship's seakeeping performance, stability, structure strength, equipment layout, construction difficulty, cost and other factors, so it is a tough assignment. We summarize the experience in ship hull optimization, deck box arrangement, column arrangement, and pontoon arrangement. Such a research may provide a reference for further domestic study.