Comparative Research of Integration Method in Dock for Deepwater Semi-Submersible Crane and Pipe-Laying Vessel

JIANG Li-qun, WANG Xi-wei, LIU Guang-hui, LI Yong, SHEN Yu-ji   

  1. Offshore Oil Engineering (Qingdao) Co., Ltd., Qingdao, Shandong 266520, China
  • Received:2017-07-31 Online:2017-12-25 Published:2018-01-02
  • Supported by:
     

Abstract: Several normal semi-submersible offshore platform integration methods in dock, including deepwater semi-submersible crane and pipe-laying vessel, are introduced, and their advantages and disadvantages are compared. In consideration of shipyard equipment and facilities, we analyze a typical jack-up and skidding integration method. This research could give reference for the optimization of semi-submersible platform jack-up and skidding integration scheme.