Ocean Engineering Equipment and Technology
Previous Articles Next Articles
XUE Heng, HUANG Sheng-hai, LIU Zhi-qiang, TANG Jia-he
Online:
Published:
Abstract: Taking the E20 deck of EP18-1 project for example, explaining how to use the PDMS software to give a pipe support integrated construction plan. Building several models and simulating the process of fabrication in the shop, transportation on SPMT and lifting on the site. Pipe supports without any clash during these process will be installed on the deck in advance. This method will contribute to increasing the efficiency of construction.
CLC Number:
TP313
XUE Heng, HUANG Sheng-hai, LIU Zhi-qiang, TANG Jia-he. Application of PDMS in Pipe Support Integrated Construction[J]. Ocean Engineering Equipment and Technology.