Ocean Engineering Equipment and Technology >
Technical Considerations and Commissioning Methods of Subsea Production Control Systems Tied Back to Existing Facilities
Online published: 2022-02-24
WANG Jutuan1 , QI Xiaoning2 , HUANG Zhiming3 . Technical Considerations and Commissioning Methods of Subsea Production Control Systems Tied Back to Existing Facilities[J]. Ocean Engineering Equipment and Technology, 2021 , 8(1) : 110 -116 . DOI: 10.12087/oeet.2095-7297.2021.01.19
/
〈 |
|
〉 |