Ocean Engineering Equipment and Technology ›› 2015, Vol. 2 ›› Issue (3): 163-167.

Previous Articles     Next Articles

Research on Polymer Flooding Equipment Arrangement of SZ 36-1 Oilfield

Zhi-sheng DU1, Jin-jin XU2, Chao MA1, Fa ZHANG1   

  1. 1.CNOOC EnerTech Equipment Technology Research & Design Center, Tianjin 300452, China
    2.Offshore Oil Engineering Co., Ltd., Tianjin 300461, China
  • Received:2015-03-26 Online:2015-06-10 Published:2016-01-21

Abstract:

Polymer flooding has been applied to offshore platform for more than 10 years. Polymer flooding technology has been very mature by now. However, there are still some problems in polymer flooding equipment planning and compatibility for production equipment etc. According to the development of SZ 36-1 Oilfield polymer flooding project, we propose different equipment arrangement plans for varied scales of polymer flooding, including the schemes for increasing the deck area, and put forward the optimization directions of polymer flooding equipment arrangement.

Key words: offshore platform, polymer flooding, equipment arrangement, deck area

CLC Number: